Prague Ring Road (D0 motorway) is a motorway that, once completed, will go around Prague and connect nine motorway-type roads leading out of the capital.[1] Of the planned roughly 83 kilometres, about half is in operation.[3] The route runs along the boundary of Prague and the Central Bohemian Region and is divided into construction projects numbered 510 to 520.[1]

History

The first thoughts of roads bypassing Prague date from 1930. The ring road appeared repeatedly in zoning plans and in 1974 it was included in the Základní komunikační systém as an outer ring about 70 km long.[1]

Construction of the first section, 515 Slivenec–Třebonice, began in autumn 1977 and traffic on it started on 20 September 1983. Part of section 510 between Satalice and Běchovice was opened on 12 October 1984 and another part on 5 November 1993. Section 516 Třebonice–Řepy followed on 28 August 2000 and section 517 Řepy–Ruzyně on 29 October 2001. On 20 September 2010 sections 512 to 514 between the D1 motorway and Slivenec, which form the southern part of the ring road, were opened. Their opening relieved Prague's streets, for example Jižní spojka and Barrandov Bridge.[1] At Slivenec builders demolished two bridges because of the planned widening of the ring road to three lanes in each direction, and during the placing of a bridge girder traffic was briefly interrupted twice overnight into 28 September 2026. [9] The firm Skanska is carrying out the work on both new overpasses. [17] The bridges demolished were those in the streets K Austisu and K Přední Kopanině, in whose place new bridges corresponding to the wider ring road will be built. [16] The police originally announced the closure of the ring road for the placing of the bridge girder for 27 September 2026 from 13:00 for roughly two hours and later moved it to the late evening hours. [12] According to the spokesman of Ředitelství silnic a dálnic, the first night closure was to begin at 23:00 and last half an hour, and the second was to follow overnight into Monday at a time not yet specified. [17] During maintenance in October 2026, road workers roughened the concrete of the carriageway in the tunnels with a high-pressure water jet to prevent tyres from skidding in the wet. [5] Ředitelství silnic a dálnic maintains the tunnels regularly six times a year; five times they remain open with restricted traffic, and during summer maintenance they are closed. [5] This part of the ring road includes the Lochkovský tunnel, over 1.6 kilometres long, and the Cholupický tunnel, also called the Komořanský tunnel, over 1.9 kilometres long. [5] According to its director Radek Mátl, Ředitelství silnic a dálnic plans three closures for both tunnels, each up to a week long, and during them wants to repair also the viaduct over the valley of the Vltava and Berounka; it has been discussing the schedule with Prague City Hall and the Technická správa komunikací hlavního města Prahy for roughly two months. [15] Since 2010 the south-western part of the ring road with both tunnels has been connecting the D1 motorway and the D5 motorway, and tens of thousands of vehicles pass along it every day. [13] The roadway in the tunnels is roughened by a water jet at a pressure of 2,000 to 2,750 bar, which removes the smoothed top layer of the concrete, and the technological shutdown takes ten to 12 hours. [8]

Completion

In December 2024 construction began on the six-lane section 511 between Běchovice and the D1 motorway, 12.6 km long.[2] Once completed it will connect the already functioning parts of the ring road.[3] At Říčany the construction will also include the Na Vysoké tunnel, just under four hundred metres long, which is to connect to a grade-separated interchange. [11] Because a provisional section of railway track across the ring road construction between the stations Praha-Uhříněves and Říčany is being moved back to its original position, a closure with single-track operation is to apply from 11 October to 3 November 2026. [7] České dráhy said that trains had run on the temporary diversion for roughly a year and that when passing the single-track section between Uhříněves and Říčany they may be delayed by about five to ten minutes. [14] For the duration of the restrictions, replacement buses of the special line XS9 are to run on working days between Říčany and the Háje metro station. [11] The average traffic intensity on the D0 was then around 60 thousand vehicles a day, of which up to 40 per cent was freight traffic.[2] In June 2026 Ředitelství silnic a dálnic announced that, because of unexpected geological conditions, the opening of the section would shift from the end of 2027 to the second half of 2028. According to Deník.cz, the delay was contributed to by complex relocations of gas pipelines and the poorer properties of the excavated soil, which was to have been used for noise-protection embankments. [6] It wants to complete the remaining three northern sections between Ruzyně and Satalice in 2031.[3] The interchange of the ring road with the D5 motorway at Třebonice, through which more than 75 thousand vehicles pass daily according to the latest count, faces a reconstruction costing CZK 568 million excluding VAT; preparatory work is to last until 13 October 2026, and the main reconstruction is to start in 2027 and finish in 2028. [10] This section is to measure 13,643 metres and the project includes the tunnels Třeboradice, Veleň and Vinoř, partial routing in cuttings, and noise-protection embankments. [6] Section 520 between Březiněves and Satalice, which is to close the whole ring and connect the D8 and D10 motorways, is according to the current ŘSD schedule to be built within about three years of construction starting in 2029. [6]

On the night of 25 September 2026, a lorry and a van collided at the 11th kilometre of the ring road in the direction of Zličín. Two people died and six were injured.[4]

The police are examining the drive of a passenger car whose driver did not stop at the patrol's signal and fled along the Prague Ring Road, through the Lochkovský tunnel and on to Strakonická street, where the drive ended in the car park at Krčský zámek. [18]

Chronology

  • — Two people died and six were injured in a night-time crash on the Prague ring road. ČTK / České noviny iROZHLAS
  • — Police closed the Prague Ring Road near Slivenec for two hours while a bridge girder was being put in place. → iROZHLAS iDNES.cz
  • — Until Sunday, 4 October 2026, night-time traffic restrictions apply for maintenance in the Lochkov and Cholupice tunnels on the Prague Ring Road. → Blesk.cz Pražský deník
  • — The construction of the Prague Ring Road is to restrict train service on the railway line from Prague to Benešov. → Pražský deník Pražský patriot
  • — The Ředitelství silnic a dálnic announced that it will open the new overpasses above the Prague Ring Road in December 2026, later than originally planned, because drilling for the relocation of a high-voltage line hit hard rock. → Pražský deník iDNES.cz, Praha

Sources

  1. Ředitelství silnic a dálnic ČR —
  2. Novinky.cz — 17 November 2024
  3. Pražský deník (ČTK) — 15 June 2026
  4. ČTK / České noviny — 25 September 2026
  5. Pražský deník — 3 October 2026
  6. Deník.cz — 8 October 2026
  7. Pražský patriot — 8 October 2026
  8. iDNES.cz — 4 October 2026
  9. ČTK / České noviny — 28 September 2026
  10. Novinky.cz — 28 September 2026
  11. Zdopravy.cz — 8 October 2026
  12. Novinky.cz — 27 September 2026
  13. Pražský deník — 2 October 2026
  14. Pražský deník — 8 October 2026
  15. Hospodářské noviny — 15 October 2026
  16. iDNES.cz, Praha — 27 September 2026
  17. Pražský deník — 27 September 2026
  18. iDNES.cz — 14 October 2026