… and the tram network 149 km; public transport vehicles carried 976.8 million passengers during the year. The Prague Ring Road is being built around the city to divert through traffic away from built-up areas; half of it is in …
- Closure of the Prague Ring Road near Slivenec for Bridge Girder Installation (2026) Event
The closure of the Prague Ring Road near Slivenec was a short-term traffic interruption on the section between the Slivenec and Ořech exits …
- D3 motorway Object
The Central Bohemian section is to be 58.5 kilometres long. From the Prague Ring Road at Jesenice it is to run south past Jílové, Hostěradice, Václavice, Voračice and Nová Hospoda. A …
- D7 motorway Object
… and Chomutov. According to the Road and Motorway Directorate of the Czech Republic, its route runs from the Prague Ring Road (D0) via Buštěhrad and Slaný-východ, from Panenský Týnec via Louny-západ and Louny, and from Postoloprty via …
- Jan Lipavský Person
… the new cable car to Petřín, the repaired Barrandov Bridge and the continuing construction of the Prague Ring Road. On 3 October 2026 Lipavský responded to the Russian ambassador Anna Ponomaryova, who had said that the …
- Klára Sovová Person
… She rejects closing the embankment by Charles Bridge to through traffic until the Městský okruh and the Prague Ring Road are completed.
- Modernisation of the wastewater treatment plant in Vinoř Event
… Mayor Michal Hroza (TOP 09) called coordinating the construction with the building of the section of the Prague Ring Road between Satalice and Březiněves a challenge. PVS is also preparing the expansion of other branch …
- Night traffic restrictions in the Lochkov and Cholupice tunnels (October 2026) Event
… traffic restrictions apply in the Lochkov and Cholupice tunnels on the southwestern section of the Prague Ring Road. The reason is maintenance carried out by the Road and Motorway Directorate (ŘSD).
- Outage of CityElefant trains near Prague on 5 October 2026 Event
… to Benešov between Praha-Uhříněves station and Říčany or Strančice. The reason is the construction of the Prague Ring Road: the temporary track section across its construction site is being moved back to its original position, so …
- Postponement of the Opening of Overpasses over the Prague Ring Road (2026) Event
Ředitelství silnic a dálnic announced that it will open the new overpasses over the Prague Ring Road in December 2026, later than it had originally expected. The reason is a longer preparation of the …
- Pražská vodohospodářská společnost Organisation
… operation during construction. The project requires coordination with the preparation of the section of the Prague Ring Road between Satalice and Březiněves, whose tunnel route extends into the area of the plant.
- Rejection of Motion to Repeal Noise Regulation (2026) Event
… area around the D1 motorway near Dluhonice near Přerov and near Bosonohy, as well as the construction of the Prague Ring Road near Běchovice and Březiněves.
- Start of tunnelling of the Žofie exploratory gallery near Václavice (2026) Event
The Central Bohemian section of the D3 is to be 58.5 kilometres long and will run from the Prague Ring Road at Jesenice past Jílové, Hostěradice, Václavice, Voračice and Nová Hospoda. The six-kilometre Václavice …
- Tomáš Portlík Person
… in the game to the end. In the iDNES.cz debate Portlík objected to Hušbauer that the construction of the Prague Ring Road began only under his coalition, although Andrej Babiš spoke about it as early as 2019.
- Vinoř Place
… 16,500 population equivalents. The construction will have to be coordinated with the planned building of the Prague Ring Road between Satalice and Březiněves.