The office of the Capital City of Prague that carries out the tasks of the city in its independent and delegated competence; it is based in the Nová radnice on Mariánské náměstí.

Prague City Hall is one of the bodies of the Capital City of Prague. It consists of the Director of City Hall and other municipal employees assigned to this body.[1] The official address is Mariánské náměstí 2/2 in Prague 1.[2]
Status and tasks
The status of City Hall is regulated by Act No. 131/2000 Coll., on the Capital City of Prague. In its independent competence, City Hall performs tasks assigned to it by the City Assembly or the City Council. It also exercises delegated competence, that is, state administration entrusted to the city, unless the law has entrusted it to another body. For example, it reviews decisions of borough bodies issued in administrative proceedings and directs how the boroughs exercise delegated competence.[1]
City Hall is headed by the Director, who is superior to all its employees. The Director answers to the Mayor for the fulfilment of tasks. The Director takes part in meetings of the City Assembly and the City Council in an advisory capacity and may not hold posts in political parties and movements. The basic organisational units of City Hall are departments, which are further divided into sections.[1]
Buildings
The main building is the Nová radnice on the eastern side of Mariánské náměstí in the Old Town. It was built between 1908 and 1911 to a design by Osvald Polívka, and the sculptors Stanislav Sucharda, Josef Mařatka and Ladislav Šaloun took part in its decoration. Šaloun's sculptures of Rabbi Loew and the Iron Knight stand at the corners of the building. Since 1945 the town hall has served as the seat of the Prague municipal administration and the Mayor, and its central hall as the meeting room of the City Assembly.[3]
Since 2006 part of the office has been based in the Škodův palác on Jungmannova Street in the New Town. The late Cubist building was designed by Pavel Janák and was built in 1929 for the Škoda Works.[4]
September 2026
At the end of September 2026 City Hall announced a tender worth CZK 64.2 million excluding VAT for works on the Vltava riverbank at Ledárny in Braník. A path for pedestrians and cyclists with a footbridge across the bay is to be built there, intended to connect to the A2 main cycle route.[5]
P+R car park building at Opatov and other P+R structures
City Hall had a P+R car park building for 495 cars built in Prague 11, between the D1 motorway and the Opatov metro station, east of Chilská Street. The construction cost the city CZK 663.8 million excluding VAT. It will be operated by Technická správa komunikací hlavního města Prahy. The building was officially opened on Wednesday, 7 October 2026, by representatives of City Hall, Prague 11 and Technická správa komunikací hlavního města Prahy.[6]
The building has ten spaces for people with physical disabilities, 43 spaces for CNG or LPG vehicles and room for 32 bicycles. One hundred spaces can be rented at a reduced price by local residents; according to the mayor of Prague 11, Martin Sedeke (ODS), more than fifty of them have been taken up.[6][7] The First Deputy Mayor for transport, Jaromír Beránek (Czech Pirate Party), said that City Hall is continuing to expand the network of P+R car parks.[6] The first stage is complete; the second is to include a rooftop park, pavements and greenery.[6]
According to the same sources, City Hall recently began construction of a P+R car park at Zličín metro with a capacity of roughly 600 cars for CZK 619 million excluding VAT, and announced a tender for a building at the Depo Hostivař station for 647 spaces with an estimated value of CZK 601 million excluding VAT.[7]
Construction of the Opatov car park and the terminal at Smíchov
The car park building on Chilská Street at Opatov was built for City Hall by an association of the firms BAK stavební společnost, Metrostav DIZ and Geosan Group. Work began at the end of June 2025.[8] Spaces with charging stations for electric cars are reserved on level P5.[6] According to Filip Hájek, director of Technická správa komunikací hlavního města Prahy, the building, like other park-and-ride car parks, charges CZK 50 per 24 hours, so locals can also park there overnight.[8][6]
According to iDNES.cz, City Hall also plans a car park building in the transport terminal at Smíchov railway station, which is to cost CZK 6.2 billion excluding VAT; the councillors approved the choice of the construction firm in the same week. Prague completed a P+R building at Černý Most for 886 cars in 2021 and opened another at the Nové Butovice metro station, with about 400 spaces, in 2024.[7]
Chronology
- — Two Prague City Hall officials charged with corruption left their posts after a police raid. → Echo24 Blesk.cz
- — Prague City Hall has set up a working group that is to prepare a permanent memorial for the victims of the shooting at the Faculty of Arts of Charles University. → Pražský deník iDNES.cz
- — Prague City Hall approved at an extraordinary council meeting 700,000 crowns for the organisers of the Korzo Národní and Koncert pro budoucnost events marking the 37th anniversary of the Velvet Revolution, after the Ministry of Culture withheld a grant from the Korzo Národní project for the first time this year. Seznam Zprávy iROZHLAS
- — Prague 8 filed an administrative lawsuit against the installation of the light barrier in Trojská ulice and requested an interim measure to stop it from being switched on. Pražský deník iDNES.cz
- — The parties STAN, Spolu (ODS and TOP 09) and Praha sobě signed a coalition agreement for Prague City Hall and presented the line-up of the new council, in which Petr Hlaváček (STAN) is to be mayor and Tomáš Portlík (ODS) first deputy mayor. → FORUM 24 Echo24
Sources
- Zákony pro lidi
- statnisprava.cz
- Kudy z nudy (CzechTourism)
- Kudy z nudy (CzechTourism)
- Pražský deník (ČTK) — 30 September 2026
- Pražský patriot — 7 October 2026
- iDNES.cz — 7 October 2026
- Pražský deník — 7 October 2026