The D7 motorway is a Czech motorway leading from Prague towards Slaný, Louny and Chomutov. According to the Road and Motorway Directorate of the Czech Republic, its route runs from the Prague Ring Road (D0) via Buštěhrad and Slaný-východ, from Panenský Týnec via Louny-západ and Louny, and from Postoloprty via Žíželice to Spořice. A figure valid as of 1 July 2026 gives the length of the motorway as 54.497 km.[2]

Development before 2009

The motorway is being created by the gradual rebuilding of road I/7. In the 1980s, construction of a four-lane road continued to the southern edge of Slaný. Further modernisation took the form of two-lane bypasses built in the corridor of the planned motorway. In the 1990s the complete bypass of Slaný was finished, and in the Ústí nad Labem Region bypasses of Panenský Týnec, Chlumčany, Louny and Postoloprty were built in the half profile of the future four-lane road. The south-western bypass of Chomutov had already been built in the 1970s.[1]

Because of the difficult mountain terrain and high costs, the section from Chomutov to the German border was built as a two-lane class I road of category S 11.5/70. Between Chomutov and Křimov it has separated directions with a climbing and a descending lane; beyond Křimov it has only a climbing lane.[1]

Sections in full profile

In 2009 the first D7 sections in the Ústí nad Labem Region were opened in the full four-lane profile of category R 25.5/100. The Sulec bypass removed the route through the centre of the village. The construction of a new four-lane road between Bitozeves and Vysočany replaced the at-grade junction of roads I/7 and I/27 near the former village of Vysočany with a grade-separated solution, in service since October 2009. In December 2013 the adjoining section from Vysočany to Chomutov was opened, where it connected to the relocated border section.[1]

In September 2016 construction began on a further 3,800 metres of motorway between Postoloprty and the Bitozeves grade-separated junction. The section was opened in August 2018, and the route follows the line of the existing road I/7, which became the left half of the motorway. This created a continuous section 26 kilometres long from Postoloprty to Chomutov.[1]

In December 2021 the section around Panenský Týnec was put into operation, connecting to the Sulec motorway bypass. The Louny bypass was opened in September 2023, with the new carriageway towards Prague in service since October 2022; the original road I/7 was then rebuilt into the carriageway towards Chomutov. The larger part of the section around Chlumčany was opened in full profile on 18 December 2023, and the 4.4 km section was completed in June 2024.[1]

Construction in the Central Bohemian Region

On 25 October 2024 construction of the 3.4 km Slaný-západ – Kutrovice section was ceremonially launched. Construction of the 6.8 km section from Kutrovice to Panenský Týnec began on 6 December 2024, and on 11 December 2024 construction began on the 6.6 km section from Knovíz to Slaný. The entire missing section on the territory of the Central Bohemian Region, 16.7 km long, is thus being built at the same time.[1]