The Elbe–Vltava Waterway denotes the navigable sections of the Elbe and Vltava rivers in the territory of Czechia, which also include the Baťa Canal. According to the Ředitelství vodních cest ČR (RVC), 514 kilometres of these three waterways are currently navigable for freight and recreational shipping [1].
Development and tasks of the RVC
The RVC states as its task a partial extension of the waterways by 42 kilometres, an improvement of their parameters, better facilities and the construction of public port infrastructure, so that they can be used for shipping to a greater extent [1]. The RVC's areas of activity include improving and extending the navigability of the Elbe, improving the parameters of the Vltava, extending and modernising the Baťa Canal, building ports and landing stages for recreational shipping, developing freight ports, information technology, service centres for vessels and berths for service vessels [2].
Kilometre marking of the Elbe waterway
According to the RVC, a total of five different kilometre systems were used on the Elbe waterway in the past: the oldest, the navigation, the unified river, the administrative and the digital one, which according to the RVC caused confusion when determining a position on the waterway [2]. Since 1 January 2009 a single "European" kilometre system has applied, with its zero point at the mouth of the Elbe into the North Sea [2]. At the state border with the Federal Republic of Germany, the Ministry of Transport and Povodí Labe set kilometre 730 as the handover kilometre [2]. In the section from the state border to Kunětice, 257 kilometre posts, 256 half-kilometre posts and 1,947 hectometre posts were installed [2]. The construction named "Kilometre marking and signposting of the Elbe waterway" in the section Kunětice–border with the Federal Republic of Germany (river kilometre 730, the middle Elbe area) was carried out by the company LABSKÁ, strojní a stavební společnost s.r.o. from Pardubice, the project was prepared by Pöyry Environment a.s. from Brno, and the administrator and operator is Povodí Labe, státní podnik, from Hradec Králové; the development of the waterway is ensured by the Ředitelství vodních cest ČR [1][2]. Construction began on 1 November 2008 and was completed on 31 December 2010 [2]. The investment plan was drawn up in September 2006 and the Ministry of Transport approved it in October 2006 [2]. The project was co-financed from the European Regional Development Fund through the Operational Programme Transport with CZK 41.339 million and from the State Transport Infrastructure Fund with CZK 7.295 million [2].
The Vltava waterway in the section České Budějovice–Hluboká nad Vltavou
The development of the Elbe–Vltava Waterway also includes a set of structures on the Vltava between České Budějovice and Hluboká nad Vltavou [3]. Dredging of the bed over a length of 4 kilometres below the České Vrbné weir ensured a navigation depth of 1.6 metres in the impoundment of the Hluboká nad Vltavou weir, completed in 1935, with a minimum width of the fairway of 20 metres; construction began in September 2008 and was completed in 2009 [3]. In the area of the former Lanna shipyard below Dlouhý most, a terminal landing stage for short-term berthing of passenger ships and small vessels with a total length of 60 metres was built, starting in August 2009 and completed in March 2010 [3]. At the České Vrbné weir, put into operation in 1968, the hydrostatic sectors were replaced by supported flaps 22.5 metres wide with a dammed height of 3 metres; construction lasted from September 2008 until 2009 [3]. The České Vrbné lock, with a drop of 7 metres, allows vessels to pass between the upper and lower impoundment and was built from May 2009 to June 2011 [3]. At the same time, in the place of the original river channel that disappeared with the construction of the weir in 1968, the České Vrbné protective harbour was built for 23 small vessels and at least two passenger ships, with a triangular basin and a lift bridge over the entrance, likewise completed in June 2011 after starting in November 2009 [3].