The oldest line of the Prague Metro, opened on 9 May 1974; it runs from Letňany through the centre and across the Nusle Bridge to Háje.

The Nusle Bridge, by which Line C crosses the Nusle Valley
The Nusle Bridge, by which Line C crosses the Nusle ValleyPhoto: Ludek · CC BY-SA 3.0 · Wikimedia Commons

Prague Metro Line C is the oldest line of the Prague Metro. Its first section, between Kačerov and the Sokolovská station (today Florenc), was opened on 9 May 1974.[1] Today the line connects Letňany in the north with Háje in the south.[6] It is operated by the Prague Public Transit Company.[2]

Origins

Construction began on 7 January 1966 as a sub-surface tram on the section between Vrchlického sady and the Nusle Bridge. In August 1967 the government decided to change the project to a conventional metro.[1] The Hlavní nádraží station, which differs in appearance from the other stations, remains from the sub-surface tram project. The line was completed in 1973 and also runs across the Nusle Bridge.[4]

The first section had nine stations. At the opening ceremony the ribbon was cut by Gustáv Husák, General Secretary of the Communist Party of Czechoslovakia. Three-car Soviet trains of the Ečs type ran there. Czechoslovak R1 units from ČKD had originally been intended, but the government rejected them even before the tests were completed.[4]

Extensions

On 7 November 1980 a section from Kačerov to Háje with four stations was opened, and on 3 November 1984 a section from Florenc to Holešovice. After 1989 stations with politically tinged names were given new ones. For example, Gottwaldova became Vyšehrad, Fučíkova became Nádraží Holešovice and Kosmonautů became Háje.[4] In June 2004 the line was extended from Nádraží Holešovice to Ládví.[4] On 8 May 2008 the metro began running to the stations Střížkov, Prosek and Letňany, where a park-and-ride lot for 700 cars and a bus terminal were built.[3]

Trains and modernisation

The line is served by M1 trains from the Kačerov depot.[2] In April 2024 the transit company issued a tender for the supply of a fully automatic system for Lines C and D. Operation without staff on board is expected to increase the capacity of Line C by up to 20 percent.[5]

Before automation, the company wants to replace all wooden sleepers on the oldest section. At the end of September 2026 the line was closed for three days between the Pražského povstání and Chodov stations to replace sleepers. Of a total of 20,097 sleepers, 3,644 remained to be replaced.[6]

Sources

  1. Národní památkový ústav, ÚOP v Praze — 2 July 2024
  2. Dopravní podnik hl. m. Prahy
  3. Pražský deník — 8 May 2008
  4. ČT24 — 8 May 2014
  5. Dopravní podnik hl. m. Prahy — 18 April 2024
  6. Pražský patriot — 25 September 2026