Praha–Letiště–Kladno is a project of Správa železnic that turns a mostly single-track, non-electrified line into a high-capacity double-track connection between the centre of Prague, the north-western part of the city, Václav Havel Airport Prague and Kladno. Construction is divided into 11 separate stages.[1][2]

Scope of the project

The project includes doubling the track, building six new stops and reconstructing twelve existing ones. The line is to be fully electrified, fourteen level crossings are to be abolished, and nine of them are to be replaced by underpasses or overpasses. More than 3,000 park-and-ride spaces are to be created at the stops. Completion of the whole project is expected in 2032; the journey from Praha Masarykovo nádraží to the airport would then take 25 minutes and to Kladno 30 minutes.[1]

Progress so far

The reconstruction of the Negrelli Viaduct is complete. Since August 2025 the new station at Praha-Bubny and the Výstaviště stop have been in operation, and trains also run between the stations Kladno-Ostrovec and Kladno.[1] In spring 2026 Správa železnic signed a contract for the modernisation of the fifteen-kilometre line between Ruzyně and Kladno. The work is carried out by the companies Subterra, OHLA ŽS, Elektrizace železnic Praha and Swietelsky, whose consortium bid a price of CZK 8.3 billion; the work is to last until 2029. The modernisation of the section between Veleslavín and Ruzyně and the construction of the section between Veleslavín and the airport are to start in 2027. Správa železnic obtained a final permit for the underground station at the airport terminal in autumn 2025, and the stage from Ruzyně to the airport is being prepared in parallel.[2]

Tunnel between Výstaviště and Dejvice

The tunnel section between Výstaviště and Dejvice is one of the stages of the project. The line will run on the surface only in the vicinity of Stromovka, after which trains will enter a tunnel towards the new station Praha-Dejvice, which is to be linked by a shared concourse with the Hradčanská metro station. All level crossings on the section will be abolished. After the railway is moved underground, a green link for pedestrians and cyclists between Stromovka and Letná Park is to be created along the freed route.[1][2]

In November 2026 Správa železnic published the result of the tender for the designer of the tunnel; it was won by the company Metroprojekt Praha with a contract worth CZK 66.8 million. The contract includes detailed design documentation with a digital building model (BIM) and the designer's supervision during construction. Správa železnic applied for the building permit in December 2025 and the permitting process is still under way. Construction of the tunnel is to begin in 2028.[1][2]

Chronology

  • — Správa železnic published the result of the tender in which the company Metroprojekt Praha, with a contract worth CZK 66.8 million, became the contractor for the design documentation of the railway tunnel between Výstaviště and Dejvice. → Ekonomický deník Pražský patriot