
The start of construction of a new exit from the D1 motorway to Černovická terasa in the south-eastern part of Brno has been postponed to spring 2027. Road builders had originally expected to start building in 2026 and finish in 2029. The expected cost of the project is 1.8 billion crowns [1][2].
The exit at kilometre 200 of the motorway is meant to relieve the congested Řípská Street significantly [1]. Traffic in this part of the city is growing denser because built-up areas in the industrial zone are increasing and more are to be built. At the start and end of factory shifts, queues form in front of the junctions. The project was already being discussed more than ten years ago, when the company Amazon unsuccessfully sought a logistics centre in the zone [1][2].
The project will include the reconstruction of the junction at kilometre 201 of the D1 and collector roads between the two exits, that is, parallel lanes with a maximum permitted speed of 80 kilometres per hour. The structure is to be prepared for a future widening of the D1 to six lanes. Roundabouts will be built on both exits where they meet the access road. It will be the sixth Brno exit between kilometres 190 and 203 of the motorway [1][2].
The project also includes the relocation of a third-class road between Černovická terasa and Tuřany. A cycle path will run alongside it, and a cycle path to Tuřany is to connect to it [1][2].
Related entries: Brno, Černovická terasa
Chronology
- — The start of construction of the D1 motorway exit to Černovická terasa in Brno has been postponed to spring. Deník: Jihomoravský kraj iDNES.cz