
Lužnice is a river in South Bohemia. In the section between Tábor and the village of Slapy the route of the newly built relocation of road II/137 crosses it, and the relocation includes a new bridge over this river.[1][2]
The bridge over the Lužnice
According to the South Bohemian Region, the bridge is the most demanding part of the whole relocation project.[1] It is to be 284.8 metres long and 14.4 metres wide, and its structure will consist of 13 spans of prestressed concrete.[1][2] A distinctive feature of the bridge is to be a reinforced-concrete arch with a span of 108 metres.[1][2]
Construction of the relocation
The South Bohemian Region began construction of the relocation of road II/137 between Tábor and Slapy on 30 September 2026.[1][2] The new road is to be 3.65 kilometres long in total, and the region is investing more than CZK 853 million including VAT in it.[1][2] A co-investor is the town of Tábor, which contributes more than CZK 7 million to the cycle path and its lighting.[1][2] The contractor is the company M – SILNICE a.s.[1]