Image from Ekolist.cz
Image from Ekolist.cz

The regional authority ruled that the plan of the company Budimex to build an asphalt mixing plant at Hřebeč in the Svitavy area will not require a full environmental impact assessment (EIA). The town of Moravská Třebová and the environmental association Český svaz ochránců přírody Rybák Svitavy appealed against the decision.[1]

The mayor of Moravská Třebová, Václav Dokoupil (Naši sousedé/lidovci), said the town fears excessive growth in traffic and an impact on nature, since a protected nature reserve lies in the area; it demands a thorough assessment. According to him, the town does not want to obstruct the construction of the D35 motorway, and its objections concern only the asphalt plant.[1]

The project

Budimex wants to use the plant mainly to produce asphalt mixes for the planned completion of the D35 motorway between Opatovec and Staré Město, for which it estimates it needs 550,000 tonnes of mixes. The facility is also meant to supply material for the construction, repair and maintenance of roads in the Pardubice Region and neighbouring regions. The company estimates annual output at 90,000 to 120,000 tonnes and plans to process milled asphalt as well. It justifies the location by its proximity to the planned construction sites.[1]

The plant is to be built on the grounds of the former Hřebeč mines near the so-called Lunar Landscape, where clay shale used to be mined and processed. Nature there has gradually recovered, and educational trails as well as hiking and cycling routes have been created.[1]

Chronology

  • — The regional authority ruled that the plan to build an asphalt mixing plant by Budimex near Hřebeč in the Svitavy district does not require a full environmental impact assessment (EIA), a decision appealed by the town of Moravská Třebová and the Czech Union for Nature Conservation. iROZHLAS Ekolist.cz

Sources

  1. Obalovna u Hřebče nemusí projít úplnou EIA, Moravská Třebová se odvolala · Ekolist.cz · 18 November 2026