
On the morning of 5 November 2026 in Plzeň, a departing České dráhy Class 362 locomotive, during a locomotive change on the Bavorský expres train from Prague, passed a signal prohibiting movement and entered the route of a freight train of the carrier CityRail. According to the association ŽESNAD.CZ, the train was stopped automatically by the ETCS system about 120 metres before the locomotive. According to Správa železnic, the event occurred at 9:08, traffic was restricted until 12:00 and the locomotive did not derail. Správa železnic has not yet quantified the damage to the switch.[1][2][3]
The circumstances are being investigated by the Drážní inspekce (Rail Inspectorate). According to its statement, at kilometre 103.842 a shunting unit made an unauthorised movement past a shunting signal showing the aspect Shunting prohibited and entered a route set for a train running at the same time.[1][2][3]
The executive director of ŽESNAD.CZ, Oldřich Sládek, said the event showed the benefit of ETCS. According to Jan Hruška of CityRail, a collision would have been practically certain without the system. As examples of accidents that ETCS could prevent, Sládek recalled the collision near Pardubice in June 2024 with four dead and the derailment of a freight train near Hustopeče nad Bečvou in February 2025.[1][3]
Chronology
- — In Pilsen, a České dráhy locomotive passed a stop signal and entered the path of a CityRail freight train, but a collision was averted by the automatic ETCS system, which stopped the train about 120 metres before the locomotive. Novinky.cz Blesk.cz