Image from the publication ČTK / České noviny
Image from the publication ČTK / České noviny, 12. 11. 2026

The state enterprise Diamo published on 12 November 2026 the first part of a feasibility study assessing the possible resumption of gold mining near Zlaté Hory in the Jeseník area. According to the study, resuming mining has economic potential. The study was commented on by Karol Šmehil, head of the enterprise's mining department.[1] Gold was mined in the Czech Republic until 1993, when the mining of polymetallic ore containing gold ended in Zlaté Hory.[1]

Expected mining volumes

According to the study, about 620 kilograms of gold a year can be obtained from the deposit. Over ten years of planned mining that would be 6.2 tonnes out of an estimated 11 tonnes of geological reserves, corresponding to a market value of roughly CZK 17.9 billion at current world market prices.[1] About 200,000 tonnes of ore would be extracted a year, from which roughly 1,556 tonnes of zinc and 265 tonnes of copper could also be obtained. According to Diamo, geological reserves amount to approximately 26,013 tonnes of zinc and 5,642 tonnes of copper. The survey is also examining the presence of gallium.[1][2]

According to the study, the metals would be mined underground by drilling and blasting, and the ore would be processed mainly in the former industrial area of Rudné doly. The study does not assume the use of cyanide and examines, for example, the use of glycine.[1]

Impact on the region

Preliminary calculations assume about 120 jobs. Zlaté Hory could receive roughly CZK 8.4 million a year from mandatory payments relating to the extraction of minerals, the mining area and property tax, and the neighbouring Heřmanovice CZK 2.9 million. The economic model also assumes voluntary contributions from mining revenues, for example grants or sponsorship donations for a sports hall, cycle paths, an outdoor swimming pool or an off-road area, worth up to hundreds of millions of crowns.[1]

Next steps

Before any resumption of mining, a more detailed study must be prepared and the environmental impact of the project assessed, followed by permitting procedures and spatial planning. Diamo has a permit for geological exploration near Zlaté Hory until 2029 and wants to complete the calculation of reserves from its data. The whole study is to be finished in 2027 and will show whether resuming mining is economically and technically feasible. In the same year Diamo could have the documentation for the environmental impact assessment (EIA).[1]

The councillors of Zlaté Hory rejected the plan to resume gold mining in 2025. Mayor Milan Rác did not want to comment on the preliminary calculations of the economic benefit of mining on 12 November 2026.[1]

Sources

  1. Diamo: Těžba zlata u Zlatých Hor by mohla regionu přinést stovky milionů korun · ČTK / České noviny · 12 November 2026
  2. Těžba u Zlatých Hor by mohla regionu přinést stamiliony korun, tvrdí Diamo · iDNES.cz · 12 November 2026