The state enterprise Povodí Labe is carrying out the restoration of the Holštejn oxbow lake, which lies in the Orlice floodplain near Hradec Králové. The contractual completion date is April 2028. The state will contribute a grant from the Ministry of the Environment covering eligible costs in the order of eight million crowns. The contractor is the company PAS Natura, chosen in a tender.[1][2]
Scope of the work
About 4,000 cubic metres of sediment will be removed from the oxbow, which will restore the water space, and two new pools will be created. Dredging is carried out from excavators placed on a floating raft made of military pontoons. Povodí Labe spokesman Aleš Prokopec described this equipment as unusual.[1][2]
The felling of woody plants is based on a dendrological survey and is to be limited to what is necessary, so that more light reaches the water surface. Selected parts of the area will be left to natural development. Povodí Labe general director Marián Šebesta said that a local beaver, which held a different opinion on the dendrological assessment, upset the plans in this part.[1][2]
Natural values of the site
Although the area was marked by the historical regulation of the river, it has kept terrain depressions, pools, blind arms and river terraces. At higher water levels of the Orlice, the surrounding meadows become waterlogged and flooded. Species recorded here earlier include European frogbit and two specially protected species, tufted loosestrife and water soldier. Šebesta said that the enterprise has monitored the site over the long term and notes the retreat of rare species; through the restoration it wants to improve conditions for their return.[1][2]
In preparation, Povodí Labe drew on a biological survey and historical data and concluded a memorandum with the city of Hradec Králové on securing the municipal land needed for the construction.[2]
Related entries: Hradec Králové
Chronology
- — Povodí Labe has begun restoring the Holštejn oxbow of the Orlice river near Hradec Králové: excavators on a floating pontoon platform will remove about 4,000 m³ of sediment and two new pools will be created; the work, costing roughly eight million crowns, is to be finished by April 2028. Deník: Královéhradecký kraj iDNES.cz