The Capital City of Prague has approved a material under which two bridges over Sulická Street in Krč are to be removed and replaced with new three-span bridges. The earlier plan envisaged a renovation; the assignment of October 2024 assumed rehabilitation of the load-bearing structure and substructure and replacement of the expansion joints.[1][2]
The explanatory report rates the condition of both bridges as grade VII, which means a comprehensive solution is needed. Surveys found defects linked to water leakage, degradation of concrete, corrosion of reinforcement and an increased chloride content. Removal is also proposed in order to coordinate with the construction of Prague Metro line D. According to Prague City Hall data from 2025, the section carries very heavy traffic, with about 125,000 vehicles per day, roughly a tenth of them heavy traffic.[1][2]
The city has provisionally put the costs at 487.4 million crowns including VAT. The sum covers, among other things, preparation, surveys, the design and the construction.[1][2]