AMESIDE is a development project by Amadeus Real Estate on the site of the demolished Inwest House of Culture in the centre of Plzeň, for which a final zoning decision was issued in November 2026.
AMESIDE is a planned mixed-use district on an area of about 3.5 hectares between Americká Avenue, Denisovo nábřeží and the main railway station in Plzeň. The Inwest House of Culture was demolished in 2013, and since then the site has mostly served as a large car park. The project includes rental housing, offices, shops, restaurants and underground garages, as well as a public space with greenery and pedestrian routes; the former Prior department store is to be demolished. The design was prepared by the London studio Chapman Taylor together with the Czech firm AGE project.[1][2][3]
Zoning decision
The investor is Amadeus Real Estate, whose board member Martin Klán says that construction costs are estimated at eight billion korunas and the construction should take three to four years. When the project was presented in 2018, two to three billion was mentioned. The investor intends to apply for a building permit once the project documentation is complete.[1][2]
The Ministry of Regional Development rejected the appeal of environmental associations against the region's zoning decision, and the decision thus became final. It granted one request of the associations: the investor must replace the dead trees without delay with the same ones and care for them for a set period. On the objection that the project conflicts with the result of the local referendum of January 2013, in which the people of Plzeň rejected the construction of a shopping centre on this site, the ministry said that neither the building authority nor the appeal body can review the legality of the zoning plan from the standpoint of the referendum, because that belongs to the administrative courts.[1][2]
The association Děti Země, which has long criticised the project, plans to file an administrative action with the Regional Court in Plzeň within a month. According to the association's representative Miroslav Patrik, it will again argue that the form of the project contradicts the result of the referendum. Děti Země had already challenged the first attempt at a zoning decision in 2022, which the ministry subsequently annulled.[1][2]